In 2018, NAVBLUE conducted a pre-study assessing the technical feasibility of simultaneous operations of AICM and Santa Lucia. In the long run, these three airports will handle up to 125 million passengers per year. Instead, he proposed a metropolitan system of airports: AICM, AIT, and Santa Lucía. That project, though, was scrapped.Īndrés Manuel López Obrador, the current Mexican president, canceled the construction of Texcoco Airport. Texcoco airport was going to serve Mexico for the next five decades with a maximum capacity of 130 million passengers, six runways, and two terminals. The Texcoco Airport’s geographical location raised architectural questions, but the project had the support of many international entities. This new airport was going to be built outside of Mexico City, in the Texcoco lake basin. To cope with the incoming demand, the former Mexican Government under Enrique Peña Nieto planned to build a new airport and close the AICM. In 2019, it served 52 million passengers. Since 2013, Mexico City Airport has reached saturation point. Santa Lucía has always worked simultaneously with Mexico City International Airport, but only because the military base workload is not strong enough to hurt the main Mexican airport’s commercial operations.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |